Solar Design & Installation

At KB ENGINEERING CO., LTD., we prioritize innovation and sustainability in our solar installation services, empowering clients to harness clean energy while reducing their environmental impact. Let us help you transition to a more sustainable energy future.

Our Services

Site Assessment

We conduct detailed site assessments to evaluate solar potential, considering factors such as location, orientation, and shading to optimize energy production.

Solar PV System Design

We design solar PV installations, covering system sizing, module selection, inverter configuration, wiring, and grid connection. This ensures efficient energy production and integration.

Load Analysis

Our detailed load analysis assesses energy needs to determine the appropriate size and capacity of electrical systems, including solar PV solutions, to meet demand without overloads.

Installation

We specialize in professional installation of solar PV systems, utilizing industry best practices and adhering to safety standards for reliable and effective energy generation.

Energy Efficiency

We recommend improvements to enhance energy efficiency, reducing consumption and operational costs.

Regulatory Compliance

We design and implement lightning protection systems to safeguard your structures and electrical systems from lightning strikes, ensuring maximum safety and compliance with safety standards.

Projects

SUN HSU Garment Co., Ltd. Solar PV Project


Project Information

Client: SUN HSU Garment Co., Ltd.

Location: Kampong Cham Province, Cambodia

Project Description

The project aimed to reduce electricity costs and minimize the environmental impact of the SUN HSU Garment Factory in Kabas Village by installing a Solar Photovoltaic (Solar PV) system.

This system was designed to address the high electricity consumption of energy-intensive machinery across three production zones, which employ 2,900 workers. The project has a total installed capacity of 1,573 kWp, consisting of three different zones with an allocation of 572 kWp and 429 kWp across them. A total of 2,420 solar PV modules were installed at a mounting height of 2.5 meters, inclined at 10 degrees facing south. In terms of energy production and environmental impact, the system is projected to generate an annual energy output of 2,276 MWh.

Over a span of 25 years, it will replace approximately 55,513.6 tons of CO2 emissions, while the CO2 emissions during operation are estimated at 1,081.8 tons. The implementation of the Solar PV system has resulted in significant operational cost savings and enhanced the factory's reputation as a leader in green technology within the garment manufacturing sector.

Address

Main Office
St 566
Phnom Penh, Cambodia 120408

Phone

+855 16-814-906